مشروع المطعم العائم في مارينا بقرية مراسي

Pedestrian Bridge

/*! elementor - v3.18.0 - 04-12-2023 */ .elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:right;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}

The Project including works as following:

– Installing CAF Piles.
– Dewatering Works.
– Post Tension Girder
– Unique Architectural Design.

Underground Water Tank

The Project including works as following:
– Dewatering Works.
– Concrete works.
– Mechanical and Electrical Works

Emaar Project

The Project including works as following:
– Excavation works.
– Backfill using suitable clear sand.
– Supply, Install 8 PVC Pipe lines.

Marassi Inner Marine

The Project including works as following:
– Excavation works.
– Dewatering for excavation Works.
– Dewatering for others (for capping beam and tie rods works).
– Installing geotextile layer and riprap for sides.

Basin 3 Liquid Bulk Terminal, Sokhna Port

Project Information:
– Type : Sea water intake pit, Intake platform, Outlet and Diffuser.
– Owner : Sonker Bunkering Company.
– Architect : ILF Consulting Engineers.
– Manager : Tebodin Middle East Ltd.
– Main Contractor : Petrojet Company.
– Subcontractor : Egyptian Company for Commodity Trading (ECCT).

Taj Sultan – New Cairo

The Project including works as following:
– Four Admin Buildings for the Tanks Area.
– Project all Utilities Pipe lines, Electrical Source
– Over Concrete.
– Pouring Concrete One Shot.
– Feeding Residential City Water Network.

Mit-Nama Gas line 42 (line From Zohar Gas Field to Mit Nama 140 KM)

The Project including works as following:
– Deep Excavations reaching depth 9 m from ground level.
– Dewatering works (Well point system – Deep well system – Surface system).
– Backfilling and restoring site to the original case.

Oscar Tower

Oscar Tower

Lorem ipsum dolor sit

Oscar Tower

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Vestibulum vitae scelerisque ante, sit amet porttitor felis. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur vulputate purus et lacus lacinia interdum. In molestie, erat quis euismod fermentum, leo quam tempor justo, quis maximus urna elit tempus orci. Nam tristique blandit sapien, sit amet auctor mauris. Suspendisse tellus leo, fringilla a imperdiet ut, gravida rhoncus dolor. Nunc consequat, enim ultricies sodales rhoncus, quam lectus finibus…