Pedestrian Bridge

Pedestrian Bridge

The Project including works

Pedestrian Bridge

/*! elementor - v3.18.0 - 04-12-2023 */ .elementor-widget-text-editor.elementor-drop-cap-view-stacked .elementor-drop-cap{background-color:#69727d;color:#fff}.elementor-widget-text-editor.elementor-drop-cap-view-framed .elementor-drop-cap{color:#69727d;border:3px solid;background-color:transparent}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap{margin-top:8px}.elementor-widget-text-editor:not(.elementor-drop-cap-view-default) .elementor-drop-cap-letter{width:1em;height:1em}.elementor-widget-text-editor .elementor-drop-cap{float:left;text-align:center;line-height:1;font-size:50px}.elementor-widget-text-editor .elementor-drop-cap-letter{display:inline-block}

The Project including works as following:

– Installing CAF Piles.
– Dewatering Works.
– Post Tension Girder
– Unique Architectural Design.

Marassi Inner Marine

Marassi Inner Marine

The Project including works

Marassi Inner Marine

The Project including works as following:
– Excavation works.
– Dewatering for excavation Works.
– Dewatering for others (for capping beam and tie rods works).
– Installing geotextile layer and riprap for sides.

Mit-Nama Gas line 42 (line From Zohar Gas Field to Mit Nama 140 KM)

The Project including works as following:
– Deep Excavations reaching depth 9 m from ground level.
– Dewatering works (Well point system – Deep well system – Surface system).
– Backfilling and restoring site to the original case.